The Point 7 Manufacturing Waste Management Procedure outlines the standard operating procedures (SOPs) related to waste rendering and disposal, waste security measures, and cannabis waste hauling and removal. This plan is written in alignment with California’s Department of Public Health (CDPH) regulations. Subtopics include: types of waste generated at the premises; waste handling best practices and disposal methods; waste collection at end of business day; cannabis waste destruction; general non-cannabis waste; hazardous material and chemical waste; liquid waste and sewage disposal; waste area sanitation; waste record keeping; ensuring limited access; security and surveillance; waste hauling entity; third-party waste hauling service; self waste hauling; and compostable materials. 

 

To download a sample, click here.

California Cannabis Manufacturing Waste Management Plan

SKU: P7CA-MAN-Waste
$1,350.00Price
  • Digital Download

  • Application Narrative

CONTACT POINT SEVEN GROUP

3459 Ringsby Court, Suite 105B

Denver, CO, United States 80216

844-POINT7G (764-6874)

QUICK LINKS

©2020 Point Seven LLC

  • image001
  • image002
  • image003